Heat and Combustion Technology

  • 12/03/2026 - jarotech 0 Comments
    Icon of the Seas

    Jarotech have supplied special burner, combustion chamber and high-pressure steam boiler with control cabinet for syngas on board wold largest cruise ship,  Icon of the Seas, which started operation from Miami in January 2024.  Star of the Seas and the following 4 new-buildiings are e also equipped with the same equipment from us.

    Read More
  • 18/11/2023 - jarotech 0 Comments
    Hydrogen-Oxygen burner

    Jarotech has several suppliers of hydrogen burners, but wanted to gain experience with hydrogen/methane/oxygen combustion in a combustion chamber for process heat. For one of our customers, we have conducted experiments with different mixtures of hydrogen and natural gas with both regular air and varying amounts of oxygen.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Statkraft Heat, Harstad Heating Central, 16 MW Low-NOx Propane

    16 MW district heating boiler with Elco RPD Low-NOx propane burner with flue gas recycling.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    1.3 MW Oxy-Fuel burner Eramet Porsgrunn

    Burner for natural gas and oxygen for high temperature with minimal flue gas loss which results in increased production in the same ladles. Gas and oxygen system placed on a suitable steel frame which is produced in black steel and painted.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Vedde Herring Oil Factory, 6 MW oil/gas burner for combustion chamber

    New 6 MW combined oil/gas burner for combustion chamber with recycled process gas.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Hafslund Oslo Celsio (formerly Fortum Heat)

    New control of 2 x 50 MW oil/natural gas burners for district heating in Oslo.

    Read More
  • 14/11/2023 - Jarotech 0 Comments
    REC Solar, Kristiansand

    Combustion chamber with gas burner for afterburning of process gas up to 1200 degrees and residence time of 2 seconds. Control with Lamtec Etamatic.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Vedde Herring Oil Factory

    30 t/h high-pressure steam boiler with 2 Elco Low-NOx burners, combined oil/natural gas.

    Read More
  • 03/10/2023 - Jarotech 0 Comments
    Tizir Tyssedal

    TiZir Tyssedal, 21.5 MW startup burner for rotary kiln

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Oslo Fire & Rescue Service

    Jarotech AS delivered remote-controlled training objects for smoke diver training to Lahaugmoen

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Hafslund Oslo Celsio AS

    A new expansion tank is being installed. We have delivered many new burners and continue to provide service and support to all natural gas, bio-oil fired and waste-fired facilities Hafslund Oslo Celsio AS has.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    EGE - Oslo Municipality

    The Energy Recovery Agency is a loyal customer of Jarotech AS.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Yara Porsgrunn and Glomfjord

    Jarotech is proud to have Yara Porsgrunn and Glomfjord as customers

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Aker Stord

    Jarotech delivered and operated a 7.8 MW boiler for the delivery of 200°C hot water, 24 barg for testing the Gjøa platform’s MEG module.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Speira AS (formerly Hydro Holmestrand)

    4 propane/butane burners for paint oven with a large regulation range

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Glencore Nikkelverk

    In 2010, Jarotech, in collaboration with Peder Halvorsen Industries, delivered a new preheating solution for Glencore Nikkelverk’s H2SO4 plant.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Boliden Odda

    Over many years, Jarotech has delivered new burners for both the rolling furnace, H2SO4 combustion chamber, and roasting oven at Boliden in Odda.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    GE Healthcare, Lindesnes - a customer from the start of Jarotech and we still have new assignments.

    GE Healthcare Lindesnes factories is one of our customers who have been with us since the start of Jarotech AS.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Statkraft Varme AS Trondheim

    Statkraft Varme AS (formerly Trondheim Elektrisitetsverk) has been a customer of Jarotech since its inception in 1984.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Lyse Neo AS

    Lyse Neo AS provides district heating to the entire South Rogaland.

    Read More
  • 12/03/2026 - jarotech 0 Comments
    Icon of the Seas

    Jarotech have supplied special burner, combustion chamber and high-pressure steam boiler with control cabinet for syngas on board wold largest cruise ship,  Icon of the Seas, which started operation from Miami in January 2024.  Star of the Seas and the following 4 new-buildiings are e also equipped with the same equipment from us.

    Read More
  • 18/11/2023 - jarotech 0 Comments
    Hydrogen-Oxygen burner

    Jarotech has several suppliers of hydrogen burners, but wanted to gain experience with hydrogen/methane/oxygen combustion in a combustion chamber for process heat. For one of our customers, we have conducted experiments with different mixtures of hydrogen and natural gas with both regular air and varying amounts of oxygen.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Statkraft Heat, Harstad Heating Central, 16 MW Low-NOx Propane

    16 MW district heating boiler with Elco RPD Low-NOx propane burner with flue gas recycling.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    1.3 MW Oxy-Fuel burner Eramet Porsgrunn

    Burner for natural gas and oxygen for high temperature with minimal flue gas loss which results in increased production in the same ladles. Gas and oxygen system placed on a suitable steel frame which is produced in black steel and painted.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Vedde Herring Oil Factory, 6 MW oil/gas burner for combustion chamber

    New 6 MW combined oil/gas burner for combustion chamber with recycled process gas.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Hafslund Oslo Celsio (formerly Fortum Heat)

    New control of 2 x 50 MW oil/natural gas burners for district heating in Oslo.

    Read More
  • 14/11/2023 - Jarotech 0 Comments
    REC Solar, Kristiansand

    Combustion chamber with gas burner for afterburning of process gas up to 1200 degrees and residence time of 2 seconds. Control with Lamtec Etamatic.

    Read More
  • 14/11/2023 - jarotech 0 Comments
    Vedde Herring Oil Factory

    30 t/h high-pressure steam boiler with 2 Elco Low-NOx burners, combined oil/natural gas.

    Read More
  • 03/10/2023 - Jarotech 0 Comments
    Tizir Tyssedal

    TiZir Tyssedal, 21.5 MW startup burner for rotary kiln

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Oslo Fire & Rescue Service

    Jarotech AS delivered remote-controlled training objects for smoke diver training to Lahaugmoen

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Hafslund Oslo Celsio AS

    A new expansion tank is being installed. We have delivered many new burners and continue to provide service and support to all natural gas, bio-oil fired and waste-fired facilities Hafslund Oslo Celsio AS has.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    EGE - Oslo Municipality

    The Energy Recovery Agency is a loyal customer of Jarotech AS.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Yara Porsgrunn and Glomfjord

    Jarotech is proud to have Yara Porsgrunn and Glomfjord as customers

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Aker Stord

    Jarotech delivered and operated a 7.8 MW boiler for the delivery of 200°C hot water, 24 barg for testing the Gjøa platform’s MEG module.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Speira AS (formerly Hydro Holmestrand)

    4 propane/butane burners for paint oven with a large regulation range

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Glencore Nikkelverk

    In 2010, Jarotech, in collaboration with Peder Halvorsen Industries, delivered a new preheating solution for Glencore Nikkelverk’s H2SO4 plant.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Boliden Odda

    Over many years, Jarotech has delivered new burners for both the rolling furnace, H2SO4 combustion chamber, and roasting oven at Boliden in Odda.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    GE Healthcare, Lindesnes - a customer from the start of Jarotech and we still have new assignments.

    GE Healthcare Lindesnes factories is one of our customers who have been with us since the start of Jarotech AS.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Statkraft Varme AS Trondheim

    Statkraft Varme AS (formerly Trondheim Elektrisitetsverk) has been a customer of Jarotech since its inception in 1984.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Lyse Neo AS

    Lyse Neo AS provides district heating to the entire South Rogaland.

    Read More

  • Priority help when it’s most urgent.

  • Efficient service of your plant.

  • Annual safety check with flue gas analysis and checklists in accordance with the authorities’ requirements.

  • Optimal burner adjustment for economic utilization of fuel with the least possible harmful emissions.

Type text here

Type text here

Solenergi

  • 12/09/2023 - Jarotech AS 0 Comments
    Circle K Norge

    In 2018, Jarotech delivered a heating system to Circle K’s self-service car wash at Fjellhamar.

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Steinseth Farm

    117 kW solar panel system

    Read More
  • 12/09/2023 - Jarotech AS 0 Comments
    Omsorgsbygg Oslo KF

    In 2019, Jarotech delivered a new solar collector system to Omsorgsbygg.

    Read More

Våre viktigste kunder

Logo - Hydro

Sunndalsøra

Logo - Hydro

Holmestrand

Logo - Yara

Holmestrand

Logo - Yara

Glomfjord

Do you want to know more about our work?

Get in touch and find out how we can help you with your project.

Contact us